Menu
Your Cart

PVC Rail System Support Track - length 2.5m (pack of 25).

PVC Rail System Support Track -  length 2.5m (pack of 25).
Guide Price
PVC Rail System Support Track - length 2.5m (pack of 25).
Guide Price
£89.27
£107.12 inc VAT
  • Product Code: F335
  • Stock:In stock, 1-2 days
  • Model: 3760

Related Products

Brand: Ceresit Stock: 9954
Delivery Time: In stock, 1-2 days
90mm Grey Polystyrene (Graphite EPS) for Insulated Render - Ceresit CT315 is a high quality expanded polystyrene board enhanced with integra..
£39.33
£47.20 inc VAT
Brand: Ceresit Stock: 9992
Delivery Time: In stock, 1-2 days
90mm White Expanded Polystyrene (EPS) for Insulated Render Systems - Ceresit CT305 is a very lightweight and easy to handle and install, exp..
£36.29
£43.55 inc VAT
Brand: Ceresit Stock: 9991
Delivery Time: In stock, 1-2 days
100mm White Expanded Polystyrene (EPS) for Insulated Render Systems - Ceresit CT305 is a very lightweight and easy to handle and install, ex..
£36.29
£43.55 inc VAT
Brand: Ceresit Stock: 9999
Delivery Time: In stock, 1-2 days
120mm White Expanded Polystyrene (EPS) for Insulated Render Systems - Ceresit CT305 is a very lightweight and easy to handle and install, ex..
£36.29
£43.55 inc VAT
Brand: Ceresit Stock: 9996
Delivery Time: In stock, 1-2 days
150mm White Expanded Polystyrene (EPS) for Insulated Render Systems - Ceresit CT305 is a very lightweight and easy to handle and install, ex..
£36.29
£43.55 inc VAT

PVC Rail System Support Track - length 2.5m (pack of 25)

Length: 2500mm

2.5m PVC Rail System Support Track profile to be used in an External Thermal Insulation Systems with EPS and other rigid insulation boards. It will keep the rigid insulation board horizontal edges in place. 


INSTALLATION

  • Fix the starter track rail to the wall with dowel screws @ 300mm to the substrate.
  • The insulation board must have a groove for the rail track to go in.
  • Apply an adhesive dab on the insulation board to cover at least 20% of the surface.
  • Push the insulation board into the rail starter track and press it firmly to the wall.
  • Align the boards horizontally and vertically.
  • Push the intermediate rail track into the installed boards horizontally and fix with dowel screws.
  • Continue to install insulation boards upwards.